This past week the project site was visited by local Ravalli County Sanitarian, Dan Hooton, and CM Paul Wilson to discuss placement / approval of the necessary Septic Permit. After the proper test hole monitoring time-line, Dan have given his full endorsement for a standard septic system to be installed just to the north of the build site. This is good news for the owners, as no increased costs will be incurred for the build-out of an engineered system and the location falls within a previously burnt portion of the property, thereby no native / undisturbed portion of the property will need to be used. We are looking to utilize the drain field chambers of 'infiltrator systems' for the buildout of the drain field (www.infiltratorsystems.com).
Mike at Tamarack Construction is busy developing Construction Drawings for eventual commencment of excavation and project construction. Present timeline indicates a breakground date of end July. The next month will be spent defining exact materials to be used within the structure, down to the specific finish details. It is over this time that we will highlight manaufacturer products of choice and supply viewers with direct link to their site.
Stay tuned.
Tim
Friday, June 19, 2009
Subscribe to:
Posts (Atom)